|
The Mahoning Township Authority held the monthly
meeting on May 16, 2011 at 6:00pm at the Mahoning Township Municipal
Building located at 1101 Bloom Rd., Danville, Pa..
Those present for the meeting were:
| Board members: |
|
| Thomas Mertz |
David Barron |
| Edward Draugelis |
Richard Jordan |
| Grier Boedker |
|
| Solicitor: |
Secretary: |
| Rick Shoch |
Lucy Hettinger |
| Operator:Absent |
|
| Public: |
|
| Sara Gerdy |
Westley Van Buskirk |
| Janae Bickhart |
Dmiro Martynowich |
| Students |
|
Bids for sewer rehabilitation were opened.
Two bids received.
1. Inland Water Pollutions Control $264,990.002. New England Pipe Cleaning $208,989.00
Will be sent to Dale Heckman, Project Manager for final
review.
The minutes of April 18, 2011 were read and approved with the
exception of the March and April Executive sessions pertained to
Legal not personnel. Motion to approve Dave Barron, second Dick
Jordan unanimous
Outstanding Authority Items
Red Lane paving: Quote to pave submitted by Gutelius. More bids to
be submitted. Bret is to talk to Supervisors to have Red Lane
possibly included in their project or separate bid from Meckleys.
Unanimous.
Generator approved to draw up specs and proceed. Approved Ed
Draugelis, second Dave Barron
Unanimous
Grease traps: The Authority needs reports of each facility that has
grease traps. An updated Resolution for grease traps will be drawn
up by Solicitor. Motion to approve made by Ed Draugelis, seconded
Grier Boedker Unanimous.
Engineers report
Dukes root control will treat 2984 lineal feet of 8” pipe at the
cost of $4744.56 and 357 lineal feet of 12” pipe at the cost of
$685.44. Dale will be notified of approval. Motion to accept made by
Grier Boedker second Dave Barron Unanimous.
Solicitors report
Alan Flenner went to Danville Borough for Discovery Items
New Business
Geisinger sent a letter of upcoming projects. Justin Drive
calculations letter to be sent to William Berger at Larson Design
Group. Notify Dale Heckman to send the letter. Unanimous
Borton-Lawson pertaining to the PBI project has insufficient
information.
When the Hughes building is sold to Geisinger an I and I must be
performed.
The Justin Drive building has surpassed the initial Tapping Fee
calculation. An additional 11 EDU’s will be billed. Unanimous
A motion to update the Water and Sewer Tapping EDU’s according to
the Engineers calculations was made by Dave Barron seconded by Dick
Jordan. Unanimous
Minor changes to Water and Sewer Rate EDU’s. Unanimous.
Focus Use
Delinquent
Time off
Approved by Dave Barron, seconded Ed Draugelis
Unanimous
Danville sewer bills motioned not to pay until corrections from the
Borough are made. All other bills approved. Grier Boedker made
motion Dick Jordan seconded the motion Unanimous.
The Danville Borough will be sent a letter regarding errors on the 4
th qtr. 2010
and 1 st qtr 2011 billings. According to Danville rate schedule
1. Nursing homes should be billed by rooms
2. Geisinger Ambulatory does not keep patients overnight,
they treat and release. No laundry facilities or food
preparation on site.
3. Geisinger McBride and Coles are warehouses only, not
industrial.
4. Hess Therapy is not a medical office.
Certificates of Deposit are up for renewal. Board
members will research rates.
Uni-tec offers services to compare PPL utilities bills for no cost.
Dave Barron motions to have them review. Grier seconds the motion as
long as there are no obligations to the Authority.
Adjournment
|